Well ... Its official, I'm upgrading my 75g (which i still havent even transfered all my corals/livestock to) to a 120gal 60x18x26!
I have two drill bits that I rather keep using (almost brand new), a .75'' and a 1.5''.
My thought is to have two .75''in returns (T'ed off a 1000gph return pump) and 3 .75'' drains. I'm thinking .75s so that I can drill them higher (I found out w/ my 75g a 1.5'' bulkhead needs to be rather low to clear the black trim). With .75'' drains I can place them higher, therefore if there's a power outage and it drains to the sump, let water will drain.
My thought is to drill 3 .75'' drain, with the possibilty of plugging the 3rd if its not needed (this way if later i need it, I dont need to empty the entire tank/stock) with strainers on them. they will all have valves on them as well to control the flow/close them.
Thoughts? Need to decide/order bulkheads asap, picking up the tank tomorrow and want to start on this project
I have two drill bits that I rather keep using (almost brand new), a .75'' and a 1.5''.
My thought is to have two .75''in returns (T'ed off a 1000gph return pump) and 3 .75'' drains. I'm thinking .75s so that I can drill them higher (I found out w/ my 75g a 1.5'' bulkhead needs to be rather low to clear the black trim). With .75'' drains I can place them higher, therefore if there's a power outage and it drains to the sump, let water will drain.
My thought is to drill 3 .75'' drain, with the possibilty of plugging the 3rd if its not needed (this way if later i need it, I dont need to empty the entire tank/stock) with strainers on them. they will all have valves on them as well to control the flow/close them.
Thoughts? Need to decide/order bulkheads asap, picking up the tank tomorrow and want to start on this project