Apex

Okay so it's getting close to time to finally buy my controller (probably next week) and some things have changed so once again looking for advice. I'll be getting the apex with the lab grade probe.
Here's the equipment I'll be running
Jebao dc12000
2 heaters
RO skimmer
Cal reactor
2 halides
Fuge light
4 jebao powerheads
Dual reactor
ATO w/ float switches

That's all I can think of so far.
 
Regarding ATO & APEX, I just switched from a SmartATO (which is nice in its own right) to the Avast Top Off Kit (because it integrates with the Apex and is lower maintenance (pressure switch vs photoeye).

It's particularly nice when you run Kalk in your ATO like I do...being able to see the logs for when and how long your ATO runs...being able to set run times and limits...etc.
 
Regarding ATO & APEX, I just switched from a SmartATO (which is nice in its own right) to the Avast Top Off Kit (because it integrates with the Apex and is lower maintenance (pressure switch vs photoeye).

It's particularly nice when you run Kalk in your ATO like I do...being able to see the logs for when and how long your ATO runs...being able to set run times and limits...etc.
I've got a diy ato with float switches so I'll just be getting the break out box
 
Back
Top