IHaveCrabs
Premium member
So I have made a little progress since my last post.
Electrical Installed
View attachment 22904
Wall taken down and Drywall up!
View attachment 22905
Main stand fit.. This will be covered in trim and stacked stone when finished.
View attachment 22907
Painted with a low shine Enamel paint.. Let's see how it holds up. $9 from the Home Depot "Whoops Section".
View attachment 22906
	
		
			
		
		
	
				
			Electrical Installed
View attachment 22904
Wall taken down and Drywall up!
View attachment 22905
Main stand fit.. This will be covered in trim and stacked stone when finished.
View attachment 22907
Painted with a low shine Enamel paint.. Let's see how it holds up. $9 from the Home Depot "Whoops Section".
View attachment 22906